BACK TO POWERPATH

PowerPath · Investor & Technology Overview

PowerPath — Turning Every Step Into Usable Energy

HYBRID SMART FLOORING FOR ENERGY-HARVESTING INFRASTRUCTURE

PowerPath is developing modular flooring technology designed to convert mechanical movement from footsteps into electrical energy using piezoelectric and electromagnetic energy harvesting.

CURRENT STAGEPrototype → Testing → Pilot Development

Early-stage venture. Performance figures on this page are prototype targets or placeholders until validated by testing.

PowerPath hybrid energy-harvesting floor tile — assembled prototype

PP-300 · PROTOTYPE MODULE · 300 × 300 MM

Section 02 · The opportunity

THE PROBLEM

Foot traffic is one of the most consistent untapped mechanical energy flows in the built environment.

MILLIONS OF FOOTSTEPS

High-footfall locations experience continuous human movement throughout the day.

MECHANICAL ENERGY DISSIPATED

The mechanical energy associated with footsteps is normally dissipated into the floor and lost.

GROWING ENERGY DEMAND

Malls, metro stations, airports, schools, stadiums and public spaces need electricity for lighting, sensing and monitoring.

NEED FOR SMARTER INFRASTRUCTURE

Low-power applications across infrastructure call for distributed, resilient energy sources.

Section 03 · What we are building

THE POWERPATH SOLUTION

A modular hybrid energy-harvesting flooring concept — six subsystems working as one tile.

01

Piezoelectric energy harvesting

02

Electromagnetic induction

03

Mechanical spring / pressure mechanism

04

Power electronics

05

Energy storage

06

Electrical output

ENERGY CONVERSION CHAIN — CONCEPTUAL
  1. FOOTSTEP

  2. MECHANICAL MOVEMENT

  3. PIEZOELECTRIC + ELECTROMAGNETIC GENERATION

  4. RECTIFICATION

  5. POWER MANAGEMENT

  6. ENERGY STORAGE

  7. ELECTRICAL OUTPUT

Section 04 · Inside the tile

HOW THE POWERPATH TILE WORKS

Seven layers, one harvesting stack. Select a layer to see its role in the prototype concept.

Exploded view of the PowerPath tile showing separated mechanical and electromagnetic layers
FIG. 01 — EXPLODED ASSEMBLY

SELECT A LAYER

TOP ACRYLIC SHEET

Provides the walking surface and transfers pressure.

Section 05 · Proof over promises

FROM CONCEPT TO VALIDATION

Where the technology stands, what must still be measured, and the exact data we will collect before any performance claim.

  1. CONCEPT

    IN PROGRESS

    Hybrid harvesting architecture defined.

  2. INITIAL PROTOTYPE

    IN PROGRESS

    First physical tile assembled.

  3. MECHANICAL & ELECTRICAL TESTING

    PLANNED

    Controlled measurement of output and durability.

  4. ENGINEERING PROTOTYPE

    PLANNED

    Refined, repeatable build for data collection.

  5. PILOT INSTALLATION

    PLANNED

    Real-world footfall deployment with a partner site.

  6. COMMERCIALIZATION

    PLANNED

    Manufacturing, certification and scaled rollout.

WHAT WE NEED TO VALIDATENO MEASURED DATA YET
  • Voltage generated per footstep

    TO BE VALIDATED

  • Current generated

    TO BE VALIDATED

  • Energy per footstep

    TO BE VALIDATED

  • Output under different loads

    TO BE VALIDATED

  • Mechanical travel / displacement

    TO BE VALIDATED

  • Repeated-cycle durability

    TO BE VALIDATED

  • Piezo vs electromagnetic contribution

    TO BE VALIDATED

  • Overall system efficiency

    TO BE VALIDATED

  • Waterproofing / environmental durability

    TO BE VALIDATED

Each metric above is a placeholder for future measured data. Any estimated or theoretical value published later will be explicitly labeled “ESTIMATED / PROTOTYPE TARGET” until confirmed by controlled testing.

Section 06 · How the business works

POWERPATH BUSINESS MODEL

The full venture on one canvas — partners, activities, customers, channels, revenue and costs.

KEY PARTNERS

  • Electronics suppliers
  • Mechanical / manufacturing partners
  • Infrastructure companies
  • Research institutions
  • Installation partners

KEY ACTIVITIES

  • R&D
  • Prototype development
  • Testing
  • Manufacturing
  • Installation
  • Maintenance

KEY RESOURCES

  • Technology / IP
  • Prototype designs
  • Engineering knowledge
  • Manufacturing capability
  • Test data

VALUE PROPOSITION

  • Energy harvesting from human movement
  • Modular flooring architecture
  • Hybrid piezoelectric + electromagnetic system
  • Potential energy storage
  • Potential smart-infrastructure integration

CUSTOMER RELATIONSHIPS

  • Installation support
  • Maintenance
  • Monitoring
  • Long-term infrastructure partnerships

CUSTOMER SEGMENTS

  • Malls
  • Metro / railway stations
  • Airports
  • Stadiums
  • Schools / colleges
  • Smart-city / public infrastructure

CHANNELS

  • Direct B2B sales
  • Infrastructure contractors
  • Government / infrastructure tenders
  • Strategic partnerships

REVENUE STREAMS

  • Tile sales
  • Installation
  • Maintenance
  • Monitoring / software
  • Future infrastructure contracts

COST STRUCTURE

  • Materials
  • Electronics
  • Manufacturing
  • R&D
  • Testing
  • Installation
  • Maintenance

Section 07 · Where we play

MARKET OPPORTUNITY

High-footfall infrastructure is everywhere people already walk. Sizing below is placeholder until validated research lands.

TAM

Global energy-harvesting / smart flooring opportunity

Market size placeholder — to be sized with validated research.

SAM

Targetable high-footfall infrastructure markets

Market size placeholder — to be sized with validated research.

SOM

Initial markets PowerPath can realistically enter

Market size placeholder — pilot customer data will refine this.

MALLS

METRO STATIONS

AIRPORTS

STADIUMS

SCHOOLS

SMART CITIES

Market estimates will be refined using validated market research and pilot customer data.

Section 08 · Honest positioning

WHY POWERPATH?

Where the hybrid approach is designed to fit — marked as design objectives, not proven superiority.

PARAMETERCONVENTIONAL FLOORINGSOLAR ENERGYPIEZOELECTRIC-ONLY FLOORINGELECTROMAGNETIC-ONLY HARVESTINGPOWERPATH HYBRID APPROACH
Footstep energy harvesting
Indoor operation
Hybrid generation
Energy storage
Modular architecture
High-footfall deployment
Potential smart-infrastructure integration
Present Design objective / potential advantage / under development Not applicable

Section 09 · Costs, honestly stated

FROM PROTOTYPE COST TO COMMERCIAL UNIT ECONOMICS

What the current prototype costs to build — with the arithmetic shown, not hidden.

CURRENT PROTOTYPE COST

ESTIMATE — SUBJECT TO SUPPLIER QUOTATIONS

  • Piezo discs

    Largest single cost driver

    ₹2,500

  • Magnets

    Permanent magnets for EM harvesting

    ₹1,000

  • Copper wire / coils

    Electromagnetic induction coils

    ₹700

  • Springs & mechanical parts

    Pressure transfer mechanism

    ₹200

  • Acrylic / base structure

    Walking surface + supports

    ₹600

  • Rectifiers & diodes

    Sub-parts: 80 + 40 + 80 + 120 + 280

    ₹600

  • Capacitors & power electronics

    Storage + conditioning

    ₹280

  • Fabrication

    Assembly labour

    ₹350

COMPUTED TOTAL

₹6,230

The line items above sum to ₹6,230, which differs from the handwritten project figure of ₹4,130 (difference: ₹2,100). Possible cause: the ₹280 power-electronics sub-part may be double-counted inside both the rectifier list and the capacitors line. Treat the computed sum as the working estimate until supplier quotations confirm each line. (Handwritten project figure: ₹4,130.)

FUTURE UNIT ECONOMICS

PLACEHOLDERS — TBD UNTIL SUPPLIER / MANUFACTURING DATA EXISTS

  • Manufacturing cost / tile

    TBD

  • Electronics cost

    TBD

  • Assembly cost

    TBD

  • Testing cost

    TBD

  • Installation cost

    TBD

  • Total cost

    TBD

  • Target selling price

    TBD

  • Gross margin

    TBD

Section 10 · The ask

₹25 LAKH DEVELOPMENT PLAN

A proposed funding allocation — not approved funding or confirmed expenditure.

PROPOSED FUNDING ALLOCATION

Engineering & prototype development

5 lakh

Materials & electronics

4 lakh

Testing & validation

3 lakh

Manufacturing tooling

4 lakh

Pilot installation

3 lakh

Electronics / software / monitoring

2 lakh

IP / design / documentation

1 lakh

Contingency

3 lakh

TOTAL

₹25 LAKH

  1. ₹25 LAKH
  2. ENGINEERING PROTOTYPE
  3. VALIDATED PERFORMANCE DATA
  4. PILOT INSTALLATION
  5. COMMERCIAL READINESS

Section 11 · Capital at work

WHAT INVESTMENT UNLOCKS

Four gated milestones. Success metrics stay TBD until targets are formally established.

MILESTONE 01

Engineering Prototype

Objective — Convert the initial prototype into a repeatable engineering build.

Deliverable — Documented engineering prototype with defined tolerances.

Success metric — TBD — target repeatability criteria to be established.

MILESTONE 02

Controlled Testing & Validation

Objective — Measure real electrical and mechanical performance under load.

Deliverable — Validation dataset covering the full test matrix.

Success metric — TBD — pass thresholds to be set before testing begins.

MILESTONE 03

Pilot Deployment

Objective — Install tiles in a live high-footfall partner location.

Deliverable — Operating pilot with monitored energy output.

Success metric — TBD — pilot KPIs to be agreed with the pilot partner.

MILESTONE 04

Commercialization Readiness

Objective — Prepare manufacturing, costing and certification pathways.

Deliverable — Commercial unit-economics model and production plan.

Success metric — TBD — readiness checklist to be defined with advisors.

Section 12 · Maturity, not marketing

RISKS WE ARE SOLVING

Every early-stage hardware venture carries risk. We name ours and show how each gets retired.

RISK 01

Energy output may be lower than theoretical expectations

MITIGATION — Controlled testing and mechanical / electrical optimization.

RISK 02

Piezoelectric component durability

MITIGATION — Repeated-cycle testing and force distribution.

RISK 03

Electromagnetic generation requires sufficient relative motion

MITIGATION — Optimize magnet-coil geometry and mechanical displacement.

RISK 04

Outdoor / environmental exposure

MITIGATION — Sealing, material selection and environmental testing.

RISK 05

Manufacturing cost

MITIGATION — Supplier optimization, modular manufacturing and volume economics.

RISK 06

Maintenance

MITIGATION — Replaceable / modular internal components.

Section 13 · The path forward

POWERPATH ROADMAP

Target timelines below are planning guides from editable configuration — not guaranteed commitments.

  1. 2026

    Prototype refinement

    Improve the mechanical build and instrument it for measurement.

  2. 2027

    Engineering prototype + testing

    Repeatable prototype plus the full validation test matrix.

  3. 2027–28

    Pilot installation

    First live deployment in a high-footfall partner location.

  4. 2028+

    Commercial product development

    Manufacturing readiness, costing and certification pathways.

  5. FUTURE

    Large-scale infrastructure deployment

    Scaled rollout across transit, retail and smart-city sites.

Section 14 · Operators

THE TEAM

Five defined roles with clear responsibilities. No invented credentials.

Prithvi Setia

CEO

Vision, product strategy, partnerships and investor communication.

Vinay

CFO

Financial planning, costing and funding utilization.

Hardeep Singh

HR

Team coordination and organizational development.

Darsh Bansal

MARKETING HEAD

Market research, branding and customer acquisition.

Vaibhav

COO

Operations, prototype / manufacturing coordination and implementation.

Section 15 · Beyond capital

WHAT WE ARE LOOKING FOR

FUNDING

Prototype engineering and pilot development.

MENTORSHIP

Mechanical engineering, electronics, manufacturing and business strategy.

PARTNERSHIPS

Infrastructure companies, manufacturing partners and pilot locations.

EXPERTISE

Testing, certification and commercialization guidance.

Section 16 · Start the conversation

LET'S TURN EVERY STEP INTO USABLE ENERGY.

PowerPath is at the intersection of energy harvesting, smart infrastructure and sustainable design. We are building the technology, validating the engineering and preparing for real-world deployment.

OPENS YOUR EMAIL CLIENT · invest@powerpath.example.com